Project status, performance and results

  • Not Yet Started
  • Started/In Progress
  • Finished
  • Activity [A1] / Task [T]
    Description of Activities
    Status
    Download
    A2
    DEVELOPMENT OF AN INTEGRATED SOLID WASTE MANAGEMENT PLAN FOR THE TWO MUNICIPALITIES SELECTED
    T2.1
    Integrated Solid Waste Management Plan For Each of the Selected Municipalities
    T2.1.1
    Stakeholder Consultation and Establishment of Objectives
    T2.1.2
    Identification and Review of Options for Fulfilment of Objectives
    T2.1.3
    Selection of a Preferred Set of Options
    T2.1.4
    Financial Analysis
    T2.1.4_R1
    ATP
    T2.1.4_R2
    ATP
    T2.1.5
    Optimal Organisational Structure for ISWM System Implementation
    T2.1.5_R1_IMC
    Study Tour in Greece (Trikala / Ioannina)
    T2.1.5_R2_IMC
    Study Tour Bar/Ulcinje/Mazura MNE
    T2.1.6
    Preliminary EIA
    T2.1.7
    Technical Options for Closure of Dumpsites
    T2.2
    Feasibility Study (For Each of the Two Municipalities)
    T2.2.1
    Selection of an appropriate Waste Facility Site
    T2.2.2
    ISWM Report and Project Planning Workshop
    T2.2.3
    Feasibility Study (covering actions listed under A through I)
    T2.2.3_A
    Presentation of the Project Measures and Technical Design
    T2.2.3_B
    Organizational Concept
    T2.2.3_C
    Implementation and Operation Concepts
    T2.2.3_D
    Cost Estimates, Financing Scheme and Financial Analysis
    T2.2.3_E
    Socio-Economic Assessment
    T2.2.3_F
    Risk Analysis
    T2.2.3_G
    Supportive Measures during Project Implementation
    T2.2.3_H
    Support of SWM Unit during the EIA Procedure
    T2.2.3_I
    Elaboration of the Feasibility Study and EIA Report